The Civil/Mechanical Engineering Building, completed and occupied in 1951, houses three major engineering departments: Civil and Environmental Engineering, Industrial Engineering, and Mechanical Engineering. The building also houses the environmental engineering program.
During 2005, a 10,000 square foot addition was added for computational mechanics.
The building is equiped with classrooms, faculty and graduate student offices, PC computing facilities, work-station computing facilities, and a wide rance of engineering laboratories.
Laboratory facilities include: materials testing, heat transfer, composite materials, controls, robotics and integrated manufacturing, hydraulics, geotechnical, environmental and work methods, and measurements.
This building was completely renovated during the 1999-2000 year.
The Center for Advanced Manufacturing and Processing , the Additive Manufacturing Laboratory, and the Advanced Materials Processing and Joining Laboratory are housed in this building.

